4-Lane Upgrade of Budhni–Shahganj NH-146B Corridor
The Construction work of 4-laning of Budhni to Shahganj bypass end (Package-III) of NH-146B from design km 73.750 to design km 102.000 involves upgrading a ~28.250 km stretch from Budhni to Shahganj bypass end into a modern 4-lane divided carriageway, with major and minor bridges, flyovers, VUPs, LVUPs, culverts, service roads, grade- separated intersections, and advanced safety systems, undertaken by NHAI to enhance corridor efficiency, reduce travel time, improve road safety, and promote socio-economic development across Sehore district and central Madhya Pradesh.
Project At Glance
| Particulars | Details/Status PKG – 3 |
| Length | 28.250 Km |
| NH No. | 146 – B |
| Project Cost | Rs. 509 Crores |
| Concessionaire | M/s Budhni Shahganj Highways Pvt. Ltd. |
| Independent Engineer | M/s Saptagon Asia Pvt. Ltd. |
| Date of LOA | 16.03.2024 |
| Date of Agreement | 29.08.2024 |
| Appointed Date | 17.08.2025 |
| Completion Date | 16.08.2027 |
| Construction Period | 730 Days |
| Lane Configuration | 4 Lane |
| Realignment | 2.050 Km. |
| Bypasses | 19.890 Km (Budhni 16.440 Km + Shahganj 3.450 Km) |
| Service Road/Slip Road | 21.230 Km (10.615 km LHS + 10.615 km RHS) |
| R.C.C. Side Drain | 24.630 km (12.315 km LHS + 12.315 km RHS) |
| Junctions | 27 nos. (Major – 1, Minor – 12, Grade Separated – 14) |
| HPC | Total – 29 no. (New – 23 nos., Reconstruction 4 nos, Widening – 2 nos.) |
| Box Culvert | Total – 28 nos. |
| Culverts on Cross Road | Total 26 (Box – 16 nos, HPC – 10 nos.) |
| VOP | 1 nos. |
| VUP | 5 nos. (Single Span 2 no. + Multi Span 3 no.) |
| LVUP | 6 nos. |
| Minor Bridge | 8 nos. |
| Major Bridge | 4 nos. |
| Toll plaza | 0 |
| Bus Shelters | Total 12 no. (6 (LHS) + 6 (RHS)) |
| Truck Lay Bye | 1 nos. (79+000 BHS) Including Toilet Block |
| Way side amenities/Rest Area | 1 nos. (91+300 RHS) (Only levelled & Graded and Boundary wall of 1.5 mtr. Height |
| Fly over | 2 no. (83+775 & 87+540) |
| ROB & RUB | 1 ROB Ch. 83+510 & 1 RUB Ch 80+905 |
| RE Wall | 18.928 Km (9.464 km LHS + 9.464 km RHS) |
| Toe Wall | 3.230 Km (1.615 km LHS + 1.615 km RHS) |
| Retaining Wall | 15.140 km (7.570 km LHS + 7.570 km RHS) |
| Boundary Wall | Entire Length of Project at BHS |
| Month | Remarks |
|---|---|
| Aug 2025 | Preview PDF |